3.0.11
More control over grading and pile extensions
This release improves the search for design terrain near site boundaries, the comparison of earthworks alternatives and the readability of cut-and-fill results. It also clarifies remaining pile-extension allowances and correction results in AutoCAD and ZWCAD.
Earthworks
Transition near site boundaries
When terrain near the boundary prevents the first tracker row from meeting the checks, the tool can search again for a continuous design surface in that sector and adjust how structures rest on it, without extending the boundary or relaxing project limits.
More alternatives in Balanced mode
Solutions that already pass the design checks are compared by cut-and-fill volumes. If the search is still reducing earthworks appreciably, it can continue rather than stopping at the first valid alternative. An absolute minimum is not guaranteed.
Clearer volume map and civil report
The 2D map distinguishes elevation changes of up to 50 mm, which remain included in the volume calculation. The report identifies structures that need review and, when evidence is available, states which check prevented the surface from being verified.
Pile analysis and correction
Cumulative extension allowance
The remaining allowance accounts for extensions already applied to each pile. Raising a whole structure uses the smallest allowance among its piles; individual correction checks each pile separately.
Rebuilt articulated trackers
The analysis recognizes the pile group associated with a rebuilt articulated tracker. If no valid association is found, it reports the omitted elements instead of assigning them to another group.
Separated 2D results
The report separates piles that can be or have been corrected from cases still pending, showing the previous extension, the amount applied in this step and the reason when correction is incomplete.